Category: TakeOff | |||||
Topic ID: 520 | |||||
Title: Surface Names Created with Takeoff/SiteNet | |||||
| |||||
Design:
NOTE: Topsoil replacement is independent of the Layer Target/Material/Subgrade settings which have no effect on the topsoil replacement. If Topsoil Replacement is to be excluded from an area, specify a Topsoil Replacement polyline for the exclusion. Over-Excavate:(only available in TakeOff)
| |||||
| |||||
| |||||
|