Informational Videos

Carlson Software on YouTube


Carlson Surface Mining


Click to download

Surface Mine Pit Design and Reserves Webinar

This webinar is presented by Grant Wenker, and was originally broadcast
on Jan 10, 2008.  Learn how Carlson Mining helps design complex surface mines as well as schedule equipment timing with Grant Wenker, Carlson Mining Software Sales and Support. He’ll show how to create and layout pits, assign direction and label names. See how the Carlson Surface Mining Module automatically subdivides the pits further and identifies by ownership for instant lease and royalty calculations. See how the Carlson Surface Mining Module uses 3D Pit designs to calculate offset bench quantities with laybacks. Then using these true, 3D volumes, Surface Equipment Timing will schedule through these multi-bench pits in 3D for precise mine planning.
Size: 52,457,848 bytesDate: Jan 10, 2008Length: 1 Hour

Click to download

Natural Regrade Webinar

This webinar is presented by Nicholas Bugosh, the creator of Natural Regrade, and
was originally broadcast on August 31, 2007.  In this webinar Nicholas demonstrates
Natural Regrade’s incredible ability to design surfaces that drain the way nature
designed, with minimal erosion. Unique in the industry, Carlson Natural Regrade
is an amazing solution to one of the key challenges of site design. For more information on Carlson Natural Regrade, click here.
Size: 54,348,888 bytesDate: August 31, 2007Length: 1 Hour

Click to download

Design Bench Pit with Tag slope groups

Design Bench Pit with Tag slope groups.wmv
Size: 74,552,745 bytesDate: Nov-18-2011

Click to download

Haul Truck Cycle Time and Production

Haul Truck Cycle Time and Production.wmv
Size: 41,377,375 bytesDate: Nov-18-2011

Click to download

Spoil Polylines and Volumes

Spoil Polylines and Volumes.wmv
Size: 32,612,119 bytesDate: Nov-18-2011

Click to download

Surface Production Timing

Surface Production Timing.wmv
Size: 18,553,833 bytesDate: Nov-18-2011

Click to download

Cut and Place Range Diagrams

Cut and Place Range Diagrams.wmv
Size: 45,909,225 bytesDate: Nov-18-2011

Click to download

Timing Project Manager for Surface Mining Equip and Calendar

Timing Project Manager for Surface Mining Equip and Calendar.wmv
Size: 28,133,127 bytesDate: Nov-18-2011

Click to download

Surface Equipment Timing

Surface Equipment Timing.wmv
Size: 62,867,025 bytesDate: Nov-18-2011

Click to download

Design Bench Pit Offset with Ramp

Design Bench Pit Offset with Ramp.wmv
Size: 51,950,491 bytesDate: Nov-18-2011

Click to download

Spoil Placement Timing

Spoil Placement Timing.wmv
Size: 43,087,451 bytesDate: Nov-18-2011

Click to download

Pit Layout by Advance and Matrix

Pit Layout by Advance and Matrix.wmv
Size: 31,218,981 bytesDate: Nov-18-2011